Maintenance of jet fuel tanks (100 & 101) at tripoli terminal
It is a EPC project that consists of comprehensive maintenance to Jet Fuel Tanks No. 100 & 101 at Tripoli Terminal. All subsequent works shall be carried out according to the contract requirements and international standards. The project combines design, engineering, construction, pre-commissioning and commissioning of the Jet Fuel Tanks to ensure safety, reliability, operability andYour Read More Link Text
Rehabilitation Works forTank 907 at Zawia Tank Farm
It is a EPC maintenance project whereas BPC’s responsibilities are engineering, procurement and work related activities such as: opening, cleaning, inspection, repair, testing and assisting to putting into operation of Tank 907 at Zawia Terminal. Complete detailed engineering related to repairs was developed specifically for this project purposes while defining, calculating and checking all theYour Read More Link Text
The maintainance and repair of (2) loading arms at jetty no. 1 & 2 at tobruk terminal
It is a EPC project that consists of maintenance and repair of two marine loading arms at Jetty 1 and 2 at Tobruk terminal. There are eight marine loading arms, four arms at jetty no. 1 and other four at jetty no. 2, which have been constructed for client Arabian Gulf Oil Company, delivered andYour Read More Link Text
Installation of new 14” white product pipeline in zawia terminal
Installation of new 14” white product pipeline in zawia terminal A turn-key project involving laying of a new 2.5 km long pipeline system for transport of white product (gasoline), connecting onshore manifold at Zawia refinery and two gasoline tanks no. 503 and 504 in Zawia new terminal. The project unifies design, engineering, construction, pre-commissioning andYour Read More Link Text
Rerouting of the Pipelines from Berth 16 to Berth 19 at Misurata Port
It is a EPC project that consists of re-routing the pipelines in Misurata port, Libya. The project consists of rerouting of four underground pipelines positioned one next to another and running from berth 19 to tie in point of existing pipeline that further continues to tank farm area. BPC project’s responsibility is Detailed Engineering Design,Your Read More Link Text
Manufacture and Supply, Annular Plates & Water Drawoff Sump Materials for NC-186..
Manufacture and Supply of New Bottom, Annular Plates & Water Drawoff Sump Materials for NC-186 Existing Stock Tank D-1002 It is a turn key project consisting of procurement and prefabrication of tank bottom, annular plates and water drawoff sump materials for Tank D-1002 in El Sharara oilfield. BPC’s responsibilities are Engineering, Procurement, Prefabrication and Logistics.Your Read More Link Text
Epc of electrical system and navigation lights at el-sharara airstrip
EPC OF ELECTRICAL SYSTEM AND NAVIGATION LIGHTS AT EL-SHARARA AIRSTRIP It is a turn-key project involving construction of electrical system and navigation lighting system of El Sharara Airport, Libya. BPC project’s responsibility is consisted of detailed design, engineering, procurement, construction, testing, commissioning and putting into operation while ensuring safety, reliability, operability and maintainability of theYour Read More Link Text
Removing the Existing GOSP-4’s Gas Absorber and Reinstall it Instead of GOSP-6’s Gas Absorber at Nafoora Field
Removing the Existing GOSP-4’s Gas Absorber and Reinstall it Instead of GOSP-6’s Gas Absorber at Nafoora Field It is a turn key project consisting of removing existing Gas Absorber located at GOSP 4 and reinstalling it at GOSP 6 location. BPC’s responsibilities are Engineering, Construction, Pre-Commissioning and Assistance to Commissioning. Project requirements include development ofYour Read More Link Text