— Bosna Petroleum Company —
Projects of wich we are proud
![](https://www.bosnapetroleum.com/wp-content/uploads/2022/07/S-4-500x500.jpg)
Maintenance of jet fuel tanks (100 & 101) at tripoli terminal
It is a EPC project that consists of comprehensive maintenance to Jet
Read More![](https://www.bosnapetroleum.com/wp-content/uploads/2022/07/37-2-500x500.jpg)
Rehabilitation Works forTank 907 at Zawia Tank Farm
It is a EPC maintenance project whereas BPC's responsibilities are eng
Read More![](https://www.bosnapetroleum.com/wp-content/uploads/2022/07/1a-1-500x500.jpg)
The maintainance and repair of (2) loading arms at jetty no. 1 & 2 at tobruk terminal
It is a EPC project that consists of maintenance and repair of two m
Read More![](https://www.bosnapetroleum.com/wp-content/uploads/2022/07/12-2-1-1-500x500.jpg)
Installation of new 14” white product pipeline in zawia terminal
Installation of new 14'' white product pipeline in zawia terminal A
Read More![](https://www.bosnapetroleum.com/wp-content/uploads/2022/07/10-1-1-500x500.jpg)
Rerouting of the Pipelines from Berth 16 to Berth 19 at Misurata Port
It is a EPC project that consists of re-routing the pipelines in M
Read More![](https://www.bosnapetroleum.com/wp-content/uploads/2022/07/59-500x500.jpg)
Manufacture and Supply, Annular Plates & Water Drawoff Sump Materials for NC-186..
Manufacture and Supply of New Bottom, Annular Plates & Water Drawo
Read More