BPC HAS SUCCESFULLY COMPLETED MAINTENANCE/REPAIR OF TWO LOADING ARM PROJECT AT TOBRUK TERMINAL, LIBYA
BPC HAS SUCCESFULLY COMPLETED MAINTENANCE/REPAIR OF TWO LOADING ARM PROJECT AT TOBRUK TERMINAL, LIBYA —————————————————————————————————————————————————————————————————————— BPC personnel successfully completed project of maintenance/ repair of two marine loading arms at jetty no.1&2 at Tobruk Terminal. The project included a full reparation of two marine loading arms in accordance with supervision of Woodfield Systems Ltd. Comprehensive overhaulYour Read More Link Text
BPC STARTED OFF WITH THE OVERHAUL OF TWO (2) MARINE LOADING ARMS AT TOBRUK TERMINAL AS PART OF EPC PROJECT WITH AGOCO
BPC STARTED OFF WITH THE OVERHAUL OF TWO (2) MARINE LOADING ARMS AT TOBRUK TERMINAL AS PART OF EPC PROJECT WITH AGOCO —————————————————————————————————————————————————————————————————————— BPC has started off with the overhaul of two (2) marine loading arms at Tobruk Terminal as per project “Maintenance and Repair of Two Loading Arms at Jetty No.1 & 2 atYour Read More Link Text
BPC has successfully completed inspection of eight (8) marine loading arms in Tobruk Terminal, Libya
BPC HAS SUCCESSFULLY COMPLETED INSPECTION OF EIGHT (8) MARINE LOADING ARMS IN TOBRUK TERMINAL, LIBYA. —————————————————————————————————————————————————————————————————————– At the end of year 2017, BPC team of had successfully completed first phase of the project, which included a full inspection of all eight loading arms, in accordance with instructions of manufacturer Woodfield Systems Ltd at jetty 1&2Your Read More Link Text