News

Testing of metering system completed with filtration units at new 14” gasoline pipeline at zawia terminal

Testing of metering system completed with filtration units at new 14” gasoline pipeline at zawia terminal               ...

BPC started off with the overhaul of two (2) marine loading arms at Tobruk Terminal as part of EPC project with AGOCO

BPC STARTED OFF WITH THE OVERHAUL OF TWO (2) MARINE LOADING ARMS AT TOBRUK TERMINAL AS PART OF EPC PROJECT WITH AGOCO ...