BPC
  • HOME
  • ABOUT US
    • WHO WE ARE
    • MISSION VISION STRATEGY
    • STAFF
    • CAMPS
    • EQUIPMENT
    • LOGISTICS
    • MANAGEMENT
    • CERTIFICATIONS
  • SERVICES
    • ENGINEERING
    • PROCUREMENT
    • CONSTRUCTION
  • NEWS
  • PROJECT
  • CONTACT US
  • EN
    • BS

Archives

  • July 17, 2022
  • 0 Comments

Maintenance of jet fuel tanks (100 & 101) at tripoli terminal

It is a EPC project that consists of comprehensive maintenance to Jet Fuel Tanks No. 100 & 101 at Tripoli Terminal. All subsequent works shall be carried out according to the contract requirements and international standards. The project combines design, engineering, construction, pre-commissioning and commissioning of the Jet Fuel Tanks to ensure safety, reliability, operability andYour Read More Link Text

Read more
  • July 17, 2022
  • 0 Comments

Rehabilitation Works forTank 907 at Zawia Tank Farm

It is a EPC maintenance project whereas BPC’s responsibilities are engineering, procurement and work related activities such as: opening, cleaning, inspection, repair, testing and assisting to putting into operation of Tank 907 at Zawia Terminal. Complete detailed engineering related to repairs was developed specifically for this project purposes while defining, calculating and checking all theYour Read More Link Text

Read more
  • July 17, 2022
  • 0 Comments

The maintainance and repair of (2) loading arms at jetty no. 1 & 2 at tobruk terminal

It is a EPC project  that consists of maintenance and repair of two marine loading arms at Jetty 1 and 2 at Tobruk terminal. There are eight marine loading arms, four arms at jetty no. 1 and other four at jetty no. 2, which have been constructed for client Arabian Gulf Oil Company, delivered andYour Read More Link Text

Read more
  • July 17, 2022
  • 0 Comments

Installation of new 14” white product pipeline in zawia terminal

Installation of new 14” white product pipeline in zawia terminal A turn-key project involving laying of a new 2.5 km long pipeline system for transport of white product (gasoline), connecting onshore manifold at Zawia refinery and two gasoline tanks no. 503 and 504 in Zawia new terminal. The project unifies design, engineering, construction, pre-commissioning andYour Read More Link Text

Read more
  • July 14, 2022
  • 0 Comments

Rerouting of the Pipelines from Berth 16 to Berth 19 at Misurata Port

It is a EPC project  that consists of re-routing the pipelines in  Misurata port, Libya. The project  consists of rerouting of four underground pipelines positioned one next to another and running from berth 19 to tie in point of existing pipeline that further continues to tank farm area. BPC project’s responsibility  is Detailed Engineering Design,Your Read More Link Text

Read more
  • July 14, 2022
  • 0 Comments

Manufacture and Supply, Annular Plates & Water Drawoff Sump Materials for NC-186..

Manufacture and Supply of New Bottom, Annular Plates & Water Drawoff Sump Materials for NC-186 Existing Stock Tank D-1002 It is a turn key project consisting of procurement and prefabrication of  tank bottom,  annular plates and water drawoff sump materials for Tank D-1002 in El Sharara oilfield. BPC’s responsibilities are Engineering, Procurement, Prefabrication and Logistics.Your Read More Link Text

Read more
  • July 13, 2022
  • 0 Comments

Epc of electrical system and navigation lights at el-sharara airstrip

EPC OF ELECTRICAL SYSTEM AND NAVIGATION LIGHTS AT EL-SHARARA AIRSTRIP It is a turn-key project involving construction of electrical system and navigation lighting system of El Sharara Airport, Libya. BPC project’s responsibility  is consisted of detailed design, engineering, procurement, construction, testing, commissioning and  putting into operation while ensuring safety, reliability, operability and maintainability of theYour Read More Link Text

Read more
  • July 13, 2022
  • 0 Comments

Removing the Existing GOSP-4’s Gas Absorber and Reinstall it Instead of GOSP-6’s Gas Absorber at Nafoora Field

Removing the Existing GOSP-4’s Gas Absorber and Reinstall it Instead of GOSP-6’s Gas Absorber at Nafoora Field It is a turn key project consisting of removing existing Gas Absorber located at GOSP 4 and reinstalling it at GOSP 6 location. BPC’s responsibilities are Engineering, Construction, Pre-Commissioning and Assistance to Commissioning. Project requirements include development ofYour Read More Link Text

Read more

Categories

  • News (16)

Tags

AGOCO AKAKUS Oil Akakus Oil Operations Arabian Gulf Oil Company BPC BPC staff BPMC Brega Petroleum Marketing Co Brega Petroleum Marketing Company Dalila Hodzic El-Sharara Airstrip electrical and navigation lighting system Endress & Hauser gasoline pipeline ISO 9001:2015 Libya maintenance/repair Pipeline Project in Zawia Terminal. Project Management quality Rida T.S. Sarajevo Summit 8800 Tank D-907 Tobruk Terminal TUV Turingen e.V. Woodfield Systems Ltd Zawia Terminal
Copyright © 2023 BaciPogled.ba